
Kubernetes in Production: A Readiness Checklist
Getting a Kubernetes cluster running takes an afternoon. Running it safely in production takes discipline. A checklist for security, reliability and operations.
Cloud costs rarely spiral because of one bad decision; they drift through thousands of small ones. FinOps brings finance, engineering and business together to manage spend as a variable cost.

FinOps is a cultural practice and operating model that brings financial accountability to variable cloud spend. The FinOps Foundation describes three iterative phases: Inform, Optimise and Operate.
| Lever | Typical impact |
|---|---|
| Delete idle resources | Unattached disks, old snapshots, unused IPs |
| Rightsize | Match instance size to actual utilisation |
| Schedule | Stop non-production outside working hours |
| Commitment discounts | Reserved instances and savings plans for steady workloads |
| Storage tiering | Move infrequently accessed data to cheaper tiers |
| Architecture | Serverless, autoscaling, managed services |
| Licensing | Bring-your-own-licence and hybrid benefits where eligible |
Set budgets and anomaly alerts, review costs in sprint ceremonies, include cost in architecture decisions and celebrate savings. A small central FinOps team enables; engineering teams own their spend.
Total spend rising is not necessarily bad if the business is growing. Track cost per transaction, per customer or per environment. Falling unit cost while volume grows is the sign of a healthy cloud practice.
| Weeks | Focus |
|---|---|
| 1–4 | Tagging policy, cost allocation, dashboards |
| 5–8 | Idle cleanup, rightsizing, scheduling |
| 9–12 | Commitment strategy, anomaly alerts, unit metrics |
We run cloud cost assessments, implement FinOps practices and tooling, and embed cost governance into cloud operations.
Next step: see NAZZTEC CloudPosture on our product roadmap or engage our Cloud & DevOps team for a cost review.

Getting a Kubernetes cluster running takes an afternoon. Running it safely in production takes discipline. A checklist for security, reliability and operations.

Security that arrives at the end of a project arrives too late. How to build automated checks into every stage of the pipeline while keeping developers productive.

Not every application should move the same way — and some should not move at all. A practical approach to classifying workloads with the 7 Rs and planning migration waves.
Tell us what you are working on. A senior NAZZTEC consultant will come back within one business day with a practical view.
We respond to every enquiry within one business day.