Cloud Migration Strategy: Applying the 7 Rs Without Surprises

Not every application should move the same way — and some should not move at all. A practical approach to classifying workloads with the 7 Rs and planning migration waves.

4 min readNAZZTEC Editorial Team
Cloud Migration Strategy: Applying the 7 Rs Without Surprises — cover illustration

Key takeaways

  • Classify every workload with one of the 7 Rs before moving anything.
  • Discovery and dependency mapping prevent most migration failures.
  • Build the landing zone first — security and governance cannot be retrofitted cheaply.
  • Track business outcomes, not just servers migrated.

The 7 Rs

StrategyWhat it meansWhen to use
RetireDecommissionUnused or redundant applications
RetainKeep on-premises for nowRegulatory, latency or recent investment reasons
RehostLift and shift to cloud VMsSpeed matters; limited change appetite
RelocateMove a virtualised platform as-isLarge VMware estates needing a quick exit
ReplatformSmall optimisations, e.g. managed databaseQuick wins without a rewrite
RepurchaseMove to SaaSCommodity capabilities such as HR or CRM
RefactorRe-architect for cloud-nativeStrategic applications needing scale and agility

Discovery comes first

Use discovery tools and interviews to build an inventory of servers, applications, data stores and their dependencies. Undocumented dependencies — a batch job calling a legacy database, a hard-coded IP address — are the most common cause of failed cutovers.

Compliance and data location

Confirm data protection obligations, customer contracts and industry rules before selecting regions and services, particularly for personal and payment data.

Build the landing zone

A landing zone provides identity, network, security, logging, policy and cost management foundations for every workload. Building it first avoids each migration team inventing its own approach.

Plan migration waves

Group applications by dependency and risk. Start with low-risk workloads to prove tooling and processes, then move to business-critical systems. Each wave includes testing, cutover planning, rollback criteria and hypercare.

Cost management from day one

Right-size instances, use reservations or savings plans for steady workloads, switch off non-production out of hours and tag everything for cost allocation. Migration without FinOps often leads to cloud bills higher than the data centre being replaced.

Measuring success

Track business outcomes: release frequency, availability, recovery capability, cost per transaction and data-centre exit milestones.

Next step: read our Azure vs AWS vs Google Cloud vs OCI comparison or talk to our Cloud & DevOps team.

Frequently asked questions

Is lift and shift a bad idea?
Not necessarily. Rehosting is a valid first step when speed matters, provided optimisation follows.
How long does a cloud migration take?
A few dozen applications can move in three to six months; large estates take one to three years in waves.
Which cloud provider should we choose?
It depends on workloads, skills, existing licensing and regulatory needs. See our neutral comparison of Azure, AWS, Google Cloud and OCI.
Keep reading

More insights

Kubernetes in Production: A Readiness Checklist — cover illustration
Cloud & DevOps

Kubernetes in Production: A Readiness Checklist

Getting a Kubernetes cluster running takes an afternoon. Running it safely in production takes discipline. A checklist for security, reliability and operations.

9 October 20264 min read

Talk to the team behind this briefing

Tell us what you are working on. A senior NAZZTEC consultant will come back within one business day with a practical view.

We respond to every enquiry within one business day.