
Immutable Backups and the 3-2-1-1-0 Rule Explained
Attackers now delete or encrypt backups before launching ransomware. Immutable, isolated and verified backups are what make recovery possible.
Hardware refreshes, virtualization licensing changes and hybrid cloud are forcing infrastructure decisions. A neutral guide to the options and how to choose.

Many organizations face end-of-support hardware, rising power and cooling costs, virtualization licensing changes and pressure to support cloud-native workloads — all at once.
| Option | Strengths | Considerations |
|---|---|---|
| Three-tier (compute, SAN, network) | Independent scaling, mature | More complex to operate |
| Hyperconverged (HCI) | Simple scaling, unified management | Compute and storage scale together |
| Disaggregated HCI | Flexibility of both models | Product-specific |
| Hybrid cloud | Burst and DR to cloud | Network and governance design |
| Colocation | Exit own facility | Contract and connectivity planning |
Evaluate total cost over five years, features you actually use, skills, ecosystem support for backup and security, and migration effort. Options include established hypervisors, open-source platforms and cloud-provider hybrid stacks.
Regulated data, customer contracts and latency needs often keep certain workloads on-premises. Design hybrid placement around these requirements.
Modern servers deliver much more performance per watt than older generations. Consolidation, higher virtualization density and efficient cooling reduce both cost and emissions.
Inventory workloads, define target placement, plan migration waves, and keep rollback options. Test backup, DR and monitoring on the new platform before moving critical systems.
Include hardware, software and virtualization licences, support, power and cooling, space, staff effort and migration costs. Compare options on the same workload assumptions, including growth.
| Capability | Target state |
|---|---|
| Lifecycle | One-click firmware and software updates |
| Monitoring | Unified health and capacity dashboards |
| Automation | Infrastructure as code for provisioning |
| Backup and DR | Integrated and tested |
| Security | Hardened management plane, MFA, segmentation |
AI workloads bring higher power density and cooling demands. If on-premises AI is on the roadmap, plan power, cooling and network capacity now.
We assess current infrastructure, model TCO for each option, design and deploy modern platforms, migrate workloads with minimal downtime and operate data centres through managed services.
Next step: explore Data Center Services and Infrastructure & Data Center Solutions.

Attackers now delete or encrypt backups before launching ransomware. Immutable, isolated and verified backups are what make recovery possible.

GDPR is not new, but compliance gaps persist. A practical checklist of what controllers and processors must have in place — and be able to evidence.

The Digital Operational Resilience Act brings ICT risk under direct financial supervision in the EU. What it requires and how to build a sustainable compliance programme.
Tell us what you are working on. A senior NAZZTEC consultant will come back within one business day with a practical view.
We respond to every enquiry within one business day.